What was decided (18 motions)
18 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.
That the agenda for March 28, 2024 be approved as amended to bring forward Section 3.1.8 Report COA2024-028, 80 Romany Ranch Road under New Applications; Minor Variance, to be presented first.
Moved by S. Strangway, seconded by S. Richardson
Carried
That the minutes of the previous meeting held February 22, 2024 be adopted as printed.
Moved by S. Richardson, seconded by G. Erickson
Carried
That minor variance application D20-2024-011 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That lot configuration related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-021, which shall be attached to and form part of the Committee’s Decision; and, That lot configuration related to this approval shall be in force for a period not exceeding twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the companion consent application D03-2022-017, set to lapse by February 9, 2026. This approval pertains to the application as described in report COA2024-021. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by B. Archer, seconded by G. Erickson
Carried
That minor variance application D20-2024-012 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That the lot configuration and boathouse related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-022, which shall be attached to and form part of the Committee’s Decision; and, That the lot configuration and boathouse use related to this approval shall be in force for a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This approval pertains to the application as described in report COA2024-022. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by G. Erickson, seconded by S. Richardson
Carried
That minor variance application D20-2024-013 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-023, which shall be attached to and form part of the Committee’s Decision; and, That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-023. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by B. Archer, seconded by S. Strangway
Carried
That minor variance application D20-2024-014 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-024, which shall be attached to and form part of the Committee’s Decision; and, That building construction related to the minor variance shall be completed within a period of thirty-six (36) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-024 Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Strangway, seconded by S. Richardson
Carried
That minor variance application D20-2024-015 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-025, which shall be attached to and form part of the Committee’s Decision; and, That the shed identified in Appendix C and Appendix D, submitted as part of Report COA2024-025, be removed within a period of eight (8) months after the date of the Notice of Decision. This condition will be considered fulfilled upon the owner providing photographic evidence that the shed has been removed to the Secretary-Treasurer; and, That approval under the Ontario Building Code (OBC) pertaining to private sanitary waste disposal be obtained within a period of eight (8) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of a review of the sewage system requirements; and, That this approval shall be in effect for a period of eight (8) months after the date of the Notice of Decision, after which this application shall be deemed to be refused. This approval pertains to the application as described in report COA2024-025. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Strangway, seconded by S. Richardson
Carried
That minor variance application D20-2024-016 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-026, which shall be attached to and form part of the Committee’s Decision; and, That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-026. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by B. Archer, seconded by S. Strangway
Carried
That minor variance application D20-2024-017 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-027, which shall be attached to and form part of the Committee’s Decision; and, That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-027. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Richardson, seconded by G. Erickson
Carried
That minor variance application D20-2024-018 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C and the drawings in Appendix D submitted as part of Report COA2024-028, which shall be attached to and form part of the Committee’s Decision; and, That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-028. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Strangway, seconded by G. Erickson
Carried
That minor variance application D20-2024-020 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C and elevation drawings in Appendix D submitted as part of Report COA2024-030, which shall be attached to and form part of the Committee’s Decision; and, That the two accessory structures identified in Appendix C and Appendix E, submitted as part of Report COA2024-030, be removed within a period of twenty-four (24) months after the date of the Notice of Decision. This condition will be considered fulfilled upon the owner providing photographic evidence that the structures have been removed to the Secretary-Treasurer. That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-030. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Richardson, seconded by S. Strangway
Carried
That the meeting be adjourned at 3:19pm.
Moved by S. Richardson, seconded by S. Strangway
Carried
That minor variance application D20-2024-012 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions 7 1. That the lot configuration and boathouse related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-022, which shall be attached to and form part of the Committee’s Decision; and, 2. That the lot configuration and boathouse use related to this approval shall be in force for a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This approval pertains to the application as described in report COA2024-022. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by G. Erickson, seconded by S. Richardson
Carried
That minor variance application D20-2024-014 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions 1. That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-024, which shall be attached to and form part of the Committee’s Decision; and, 2. That building construction related to the minor variance shall be completed within a period of thirty-six (36) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. 10 This approval pertains to the application as described in report COA2024-024 Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Strangway, seconded by S. Richardson
Carried
That minor variance application D20-2024-015 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions 1. That this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-025, which shall be attached to and form part of the Committee’s Decision; and, 2. That the shed identified in Appendix C and Appendix D, submitted as part of Report COA2024-025, be removed within a period of eight (8) months after the date of the Notice of Decision. This condition will be considered fulfilled upon the owner providing photographic evidence that the shed has been removed to the Secretary-Treasurer; and, 3. That approval under the Ontario Building Code (OBC) pertaining to private sanitary waste disposal be obtained within a period of eight (8) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of a review of the sewage system requirements; and, 4. That this approval shall be in effect for a period of eight (8) months after the date of the Notice of Decision, after which this application shall be deemed to be refused. 12 This approval pertains to the application as described in report COA2024-025. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by S. Strangway, seconded by S. Richardson
Carried
That minor variance application D20-2024-016 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions 13 1. That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C submitted as part of Report COA2024-026, which shall be attached to and form part of the Committee’s Decision; and, 2. That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-026. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.
Moved by B. Archer, seconded by S. Strangway
Carried
That minor variance application D20-2024-020 be GRANTED, as the application meets the tests set out in Section 45(1) of the Planning Act. Conditions 1. That building construction related to this approval shall proceed generally in accordance with the sketch in Appendix C and elevation drawings in Appendix D submitted as part of Report COA2024-030, which shall be attached to and form part of the Committee’s Decision; and, 2. That the two accessory structures identified in Appendix C and Appendix E, submitted as part of Report COA2024-030, be removed within a period of twenty-four (24) months after the date of the Notice of Decision. This condition will be considered fulfilled upon the owner providing 18 photographic evidence that the structures have been removed to the Secretary-Treasurer. 3. That building construction related to the minor variance shall be completed within a period of twenty-four (24) months after the date of the Notice of Decision, failing which this application shall be deemed to be refused. This condition will be considered fulfilled upon completion of the first Building Inspection. This approval pertains to the application as described in report COA2024-030. Fulfillment of all conditions is required for the Minor Variance to be considered final and binding.